Unit Commitment¶
Unit commitment constraints are implemented for the Generator, Link and Process
components. They are used to model the start-up and shut-down constraints, as
well as ramping constraints. The implementation is based on Taylor (2015)1,
and is supplemented with work by Hua et al. (2017)2 for a tightened linear
relaxation.
Process formulation
Unless stated otherwise, all formulations shown for Link apply analogously to Process by replacing \((f,\hat f,F,l)\) with \((r,\hat r,R,m)\) and Link-* with Process-* in the constraint names.
Start-Up and Shut-down¶
For components marked as committable=True, new binary status variables
\(u_{*,t} \in \{0,1\}\) are introduced, which indicate whether the component is
running (1) or not (0) in period \(t\). This turns the model into a mixed-integer
linear programme (MILP). The restrictions on the dispatch now enforce that the
dispatch \(g_{n,s,t}\), \(f_{l,t}\) or \(r_{m,t}\) is only non-zero if the component is running,
i.e. \(u_{*,t} = 1\):
| Constraint | Name |
|---|---|
| \(g_{n,s,t} \geq u_{n,s,t} \cdot \underline{g}_{n,s,t} \cdot \hat{g}_{n,s}\) | Generator-com-p-lower |
| \(g_{n,s,t} \leq u_{n,s,t} \cdot \bar{g}_{n,s,t} \cdot \hat{g}_{n,s}\) | Generator-com-p-upper |
| Constraint | Name |
|---|---|
| \(f_{l,t} \geq u_{l,t} \cdot \underline{f}_{l,t} \cdot \hat{f}_{l}\) | Link-com-p-lower |
| \(f_{l,t} \leq u_{l,t} \cdot \bar{f}_{l,t} \cdot \hat{f}_{l}\) | Link-com-p-upper |
| Constraint | Name |
|---|---|
| \(r_{m,t} \geq u_{m,t} \cdot \underline{r}_{m,t} \cdot \hat{r}_{m}\) | Process-com-p-lower |
| \(r_{m,t} \leq u_{m,t} \cdot \bar{r}_{m,t} \cdot \hat{r}_{m}\) | Process-com-p-upper |
!!! note | Combined with Capacity Expansion
Unit commitment can be combined with capacity expansion for co-optimized investment and operational decisions:
- Committable and Extendable Components - Continuous capacity expansion with unit commitment using big-M formulation
- Modular and Committable Components - Discrete capacity blocks with integer commitment variables
///
If the minimum up time \(T_{\textrm{min_up}}\) is set, status switches are constrained to ensure that the component is running for at least \(T_{\textrm{min_up}}\) snapshots after it has been started up:
Constraint Generator-com-up-time:
Constraint Link-com-up-time:
The component may have been up for some periods before the optimisation period (n.optimize(snapshots=snapshots)). Start-ups before the start of snapshots count towards the sum in the constraint, so a component that started up less than \(T_{\textrm{min_up}}\) snapshots before snapshots is forced to remain up for the difference. If snapshots starts at the beginning of n.snapshots or no statuses have been computed before, the time before is reconstructed from the input attributes: the component was up for up_time_before snapshots, or, if down_time_before is positive, down for down_time_before snapshots (down_time_before takes precedence). If snapshots starts in the middle of n.snapshots, the statuses before snapshots are read from n.c.generators.dynamic.status as set by previous runs, and up_time_before/down_time_before apply to the time before n.snapshots. All snapshots before snapshots count as solved once n.c.generators.dynamic.status is set. Successive runs must therefore solve the snapshots in order, starting from n.snapshots[0], as n.optimize.optimize_with_rolling_horizon() does. The start-ups before snapshots are the positive differences of these statuses, which may be fractional with the linearized unit commitment.
At the end of snapshots the minimum up-time in the constraint is only enforced for the remaining snapshots, if the number of remaining snapshots is less than \(T_{\textrm{min_up}}\).
If the minimum down time \(T_{\textrm{min_down}}\) is set, status switches are constrained to ensure that the component is not running for at least \(T_{\textrm{min_down}}\) snapshots after it has been shut down:
Constraint Generator-com-down-time:
Constraint Link-com-down-time:
The component may have been down for some periods before the optimisation period. Shut-downs before the start of snapshots count towards the sum in the constraint in the same way as start-ups do for the minimum up-time.
Furthermore, two state transition variables for start-up (\(su_{*,t} \in \{0,1\}\)) and shut-down (\(sd_{*,t} \in\) {0,1}) are introduced to associate them with start-up and shut-down cost terms in the objective function. Start-up and shut-down costs can be static or time series varying per snapshot. The constraints are set so that the start-up variable is only non-zero if the component has just started up, i.e. \(u_{n,s,t} - u_{n,s,t-1} = 1\), and the shut-down variable is only non-zero if the component has just shut down, i.e. \(u_{n,s,t-1} - u_{n,s,t} = 1\):
| Constraint | Name |
|---|---|
| \(su_{n,s,t} \geq u_{n,s,t} - u_{n,s,t-1}\) | Generator-com-transition-start-up |
| \(sd_{n,s,t} \geq u_{n,s,t-1} - u_{n,s,t}\) | Generator-com-transition-shut-down |
| Constraint | Name |
|---|---|
| \(su_{l,t} \geq u_{l,t} - u_{l,t-1}\) | Link-com-transition-start-up |
| \(sd_{l,t} \geq u_{l,t-1} - u_{l,t}\) | Link-com-transition-shut-down |
These constraints are defined in the function define_operational_constraints_for_committables().
Mapping of symbols to component attributes
| Symbol | Attribute | Type |
|---|---|---|
| \(g_{n,s,t}\) | n.generators_t.p |
Decision variable |
| \(u_{n,s,t}\) | n.generators_t.status |
Decision variable |
| \(su_{n,s,t}\) | n.generators_t.start_up |
Decision variable |
| \(sd_{n,s,t}\) | n.generators_t.shut_down |
Decision variable |
| \(\hat{g}_{n,s}\) | n.generators.p_nom |
Parameter |
| \(\underline{g}_{n,s,t}\) | n.generators_t.p_min_pu |
Parameter |
| \(\bar{g}_{n,s,t}\) | n.generators_t.p_max_pu |
Parameter |
| \(T_{\textrm{min_up}}\) | n.generators.min_up_time |
Parameter |
| \(T_{\textrm{min_down}}\) | n.generators.min_down_time |
Parameter |
| \(T_{\textrm{up_time_before}}\) | n.generators.up_time_before |
Parameter |
| \(T_{\textrm{down_time_before}}\) | n.generators.down_time_before |
Parameter |
| Symbol | Attribute | Type |
|---|---|---|
| \(f_{l,t}\) | n.links_t.p |
Decision variable |
| \(u_{l,t}\) | n.links_t.status |
Decision variable |
| \(su_{l,t}\) | n.links_t.start_up |
Decision variable |
| \(sd_{l,t}\) | n.links_t.shut_down |
Decision variable |
| \(\hat{f}_{l}\) | n.links.p_nom |
Parameter |
| \(\underline{f}_{l,t}\) | n.links_t.p_min_pu |
Parameter |
| \(\bar{f}_{l,t}\) | n.links_t.p_max_pu |
Parameter |
| \(T_{\textrm{min_up}}\) | n.links.min_up_time |
Parameter |
| \(T_{\textrm{min_down}}\) | n.links.min_down_time |
Parameter |
| \(T_{\textrm{up_time_before}}\) | n.links.up_time_before |
Parameter |
| \(T_{\textrm{down_time_before}}\) | n.links.down_time_before |
Parameter |
| Symbol | Attribute | Type |
|---|---|---|
| \(r_{m,t}\) | n.processes_t.p |
Decision variable |
| \(u_{m,t}\) | n.processes_t.status |
Decision variable |
| \(su_{m,t}\) | n.processes_t.start_up |
Decision variable |
| \(sd_{m,t}\) | n.processes_t.shut_down |
Decision variable |
| \(\hat{r}_{m}\) | n.processes.p_nom |
Parameter |
| \(\underline{r}_{m,t}\) | n.processes_t.p_min_pu |
Parameter |
| \(\bar{r}_{m,t}\) | n.processes_t.p_max_pu |
Parameter |
| \(T_{\textrm{min_up}}\) | n.processes.min_up_time |
Parameter |
| \(T_{\textrm{min_down}}\) | n.processes.min_down_time |
Parameter |
| \(T_{\textrm{up_time_before}}\) | n.processes.up_time_before |
Parameter |
| \(T_{\textrm{down_time_before}}\) | n.processes.down_time_before |
Parameter |
Ramping¶
Ramp rate limits can be defined for increasing output \(ru_{n,s,t}\) and decreasing output \(rd_{n,s,t}\). By default these are null and ignored. They must be provided per unit of the nominal capacity.
Note
When provided, ramping limits are also considered if they are not
committable (committable=False), i.e. the component is not subject to start-up and shut-down constraints.
A unified ramp constraint formulation is used for all component types (fixed, extendable, and committable). For committable components, additional ramp limits at start-up \(rusu_{n,s}\) and shut-down \(rdsd_{n,s}\) can be specified. The general form for \(t \in \{1,\dots |T|-1\}\) is:
| Constraint | Dual Variable | Name |
|---|---|---|
| \((g_{n,s,t} - g_{n,s,t-1}) \geq \left[ -rd_{n,s,t} \cdot u_{n,s,t} -rdsd_{n,s}(u_{n,s,t-1} - u_{n,s,t})\right] \hat{g}_{n,s}\) | n.generators_t.mu_ramp_limit_down |
Generator-p-ramp_limit_down |
| \((g_{n,s,t} - g_{n,s,t-1}) \leq \left[ru_{n,s,t} \cdot u_{n,s,t-1} + rusu_{n,s} (u_{n,s,t} - u_{n,s,t-1})\right] \hat{g}_{n,s}\) | n.generators_t.mu_ramp_limit_up |
Generator-p-ramp_limit_up |
| Constraint | Dual Variable | Name |
|---|---|---|
| \((f_{l,t} - f_{l,t-1}) \geq \left[ -rd_{l,t} \cdot u_{l,t} -rdsd_{l,t}(u_{l,t-1} - u_{l,t})\right] \hat{f}_{l}\) | n.links_t.mu_ramp_limit_down |
Link-p-ramp_limit_down |
| \((f_{l,t} - f_{l,t-1}) \leq \left[ru_{l,t} \cdot u_{l,t-1} + rusu_{l} (u_{l,t} - u_{l,t-1})\right] \hat{f}_{l}\) | n.links_t.mu_ramp_limit_up |
Link-p-ramp_limit_up |
| Constraint | Dual Variable | Name |
|---|---|---|
| \((r_{m,t} - r_{m,t-1}) \geq \left[ -rd_{m,t} \cdot u_{m,t} -rdsd_{m,t}(u_{m,t-1} - u_{m,t})\right] \hat{r}_{m}\) | n.processes_t.mu_ramp_limit_down |
Process-p-ramp_limit_down |
| \((r_{m,t} - r_{m,t-1}) \leq \left[ru_{m,t} \cdot u_{m,t-1} + rusu_{m} (u_{m,t} - u_{m,t-1})\right] \hat{r}_{m}\) | n.processes_t.mu_ramp_limit_up |
Process-p-ramp_limit_up |
For non-committable components, \(u_{*,t} = 1\) for all \(t\), so the constraints simplify to:
- \((g_{n,s,t} - g_{n,s,t-1}) \geq -rd_{n,s,t} \cdot \hat{g}_{n,s}\)
- \((g_{n,s,t} - g_{n,s,t-1}) \leq ru_{n,s,t} \cdot \hat{g}_{n,s}\)
For extendable components, \(\hat{g}_{n,s}\) is replaced by the capacity variable \(G_{n,s}\).
Initial Conditions¶
The ramp constraints require knowledge of the previous snapshot's dispatch. At the first snapshot of the optimization horizon, this is handled as follows:
- Rolling horizon optimization: When
n.optimize(snapshots=...)starts after the first snapshot inn.snapshotsand previous runs have set the dispatch, the dispatch and the commitment status from the previous snapshot are used automatically. With the linearized unit commitment the previous status may be fractional. - First snapshot of
n.snapshotsor no previous run: Thep_initattribute specifies the initial dispatch level. For committable components, the initial status is determined byup_time_before > 0(ordown_time_before > 0, which takes precedence) and the initial dispatch is zero if the component was off. Ifp_initis not set (NaN), no ramp constraint is applied at the first snapshot. Non-committable components are always on;up_time_beforeanddown_time_beforeare ignored for them.
These constraints are defined in the function define_ramp_limit_constraints().
Mapping of symbols to component attributes
| Symbol | Attribute | Type |
|---|---|---|
| \(g_{n,s,t}\) | n.generators_t.p |
Decision variable |
| \(G_{n,s}\) | n.generators.p_nom_opt |
Decision variable |
| \(u_{n,s,t}\) | n.generators_t.status |
Decision variable |
| \(\hat{g}_{n,s}\) | n.generators.p_nom |
Parameter |
| \(\underline{g}_{n,s,t}\) | n.generators_t.p_min_pu |
Parameter |
| \(\bar{g}_{n,s,t}\) | n.generators_t.p_max_pu |
Parameter |
| \(ru_{n,s,t}\) | n.generators_t.ramp_limit_up |
Parameter |
| \(rd_{n,s,t}\) | n.generators_t.ramp_limit_down |
Parameter |
| \(rusu_{n,s}\) | n.generators.ramp_limit_start_up |
Parameter |
| \(rdsd_{n,s}\) | n.generators.ramp_limit_shut_down |
Parameter |
| \(g_{n,s,0}\) | n.generators.p_init |
Parameter (initial dispatch) |
| Symbol | Attribute | Type |
|---|---|---|
| \(f_{l,t}\) | n.links_t.p |
Decision variable |
| \(F_{l}\) | n.links.p_nom_opt |
Decision variable |
| \(u_{l,t}\) | n.links_t.status |
Decision variable |
| \(\hat{f}_{l}\) | n.links.p_nom |
Parameter |
| \(\underline{f}_{l,t}\) | n.links_t.p_min_pu |
Parameter |
| \(\bar{f}_{l,t}\) | n.links_t.p_max_pu |
Parameter |
| \(ru_{l,t}\) | n.links_t.ramp_limit_up |
Parameter |
| \(rd_{l,t}\) | n.links_t.ramp_limit_down |
Parameter |
| \(rusu_{l}\) | n.links.ramp_limit_start_up |
Parameter |
| \(rdsd_{l}\) | n.links.ramp_limit_shut_down |
Parameter |
| \(f_{l,0}\) | n.links.p_init |
Parameter (initial dispatch) |
| Symbol | Attribute | Type |
|---|---|---|
| \(r_{m,t}\) | n.processes_t.p |
Decision variable |
| \(R_{m}\) | n.processes.p_nom_opt |
Decision variable |
| \(u_{m,t}\) | n.processes_t.status |
Decision variable |
| \(\hat{r}_{m}\) | n.processes.p_nom |
Parameter |
| \(\underline{r}_{m,t}\) | n.processes_t.p_min_pu |
Parameter |
| \(\bar{r}_{m,t}\) | n.processes_t.p_max_pu |
Parameter |
| \(ru_{m,t}\) | n.processes_t.ramp_limit_up |
Parameter |
| \(rd_{m,t}\) | n.processes_t.ramp_limit_down |
Parameter |
| \(rusu_{m}\) | n.processes.ramp_limit_start_up |
Parameter |
| \(rdsd_{m}\) | n.processes.ramp_limit_shut_down |
Parameter |
| \(r_{m,0}\) | n.processes.p_init |
Parameter (initial dispatch) |
Linearization¶
The implementation is based on Hua et al. (2017)2 and relaxes the binary unit commitment variables to continuous variables:
This allows for partial commitment states (generators can be partially on/off), making the problem more computationally tractable while losing some accuracy. To enable this, use:
n.optimize(linearized_unit_commitment=True)
Not compatible with modular components
Linearized unit commitment cannot be used with modular committable components and will result in a ValueError.
To tighten the relaxation, additional constraints are introduced that improve capturing the relationship between commitment status, ramping, and dispatch. At the first snapshot they use the previous dispatch and status as described in Initial Conditions and are skipped if the previous dispatch is unknown. The tightening is only applied to units whose start-up and shut-down costs are equal in every snapshot; for the other units the unit commitment variables are purely relaxed and a warning is logged. The added constraints limit the dispatch during partial start-up and shut-down, as well as ramping during partial commitment:
Constraint Generator-com-p-before:
Constraint Generator-com-p-current:
Constraint Generator-com-partly-start-up:
Constraint Generator-com-partly-shut-down:
Constraint Link-com-p-before:
Constraint Link-com-p-current:
Constraint Link-com-partly-start-up:
Constraint Link-com-partly-shut-down:
These constraints are defined in the function define_operational_constraints_for_committables().
Examples¶
-
Unit Commitment
Models generator unit commitment with start-up and shut-down costs, ramping limits, minimum part loads, up and down times using binary variables.
-
Negative Prices in Linearized Unit Commitment
Demonstrates how negative electricity prices emerge in linearized unit commitment when generators face high cycling costs and prefer to stay online at negative prices.
-
J.A. Taylor (2015), Convex Optimization of Power Systems, Cambridge University Press, Chapter 4.3. ↩
-
B. Hua, R. Baldick and J. Wang (2018), Representing Operational Flexibility in Generation Expansion Planning Through Convex Relaxation of Unit Commitment, IEEE Transactions on Power Systems, 33, 2, 2272-2281, doi:10.1109/TPWRS.2017.2735026, equations (21-24). ↩↩